Drilling confirms large copper-gold system at Pipeline

March 5th, 2013 | ASX Announcements

Assays have been received from the first stage exploration programme of RAB and Slimline RC drilling on the Pipeline copper-gold prospect within Terramin’s Preamimma District Project (Figure 3). Drilling commenced on 15 January 2013 and concluded on 24 January 2013.

Click here to download PDF